Pool Maintenance in Mount Pleasant & Daniel Island
Pool maintenance in Mount Pleasant starts with the water: Mount Pleasant Waterworks draws from the deep Middendorf aquifer, and its low-calcium supply leaves pools short of the calcium plaster needs after every top-up. On Daniel Island the bigger issue is salt, because equipment within 1,000 feet of tidal marsh faces severe corrosion. Weekly plans start at $129 a month.
- Operated by SC Coastal Pools
- 5.0 Google rating, 70+ reviews
- CPO-certified technicians
- Since 2017 in the Charleston area
- A+ BBB rating
- Licensed, bonded and insured
East Cooper pool maintenance plans
Calcium tested and dosed every week on low-mineral town water. Full plan comparison.
| Chemical Only | Most bookedFull Service | Premium | |
|---|---|---|---|
| Monthly price | $129/mo | $259/mo | $329/mo |
| Water testing and balancing | Weekly | Weekly | Weekly |
| Skim, brush, vacuum, baskets | Not included | Weekly | Weekly |
| Equipment and automation check | Not included | Weekly | Weekly |
| Salt cell inspection | Not included | Not included | Included |
- Quote
- Free
- Visits
- Weekly, all year
- Phone hours
- Mon–Sat, 7am–5pm
Before you call
Have ready: your neighborhood, and whether the pool runs on salt or chlorine.
Why do Mount Pleasant pools need calcium added?
Mount Pleasant pools need calcium added because the town's aquifer water arrives with calcium far below the 200 ppm minimum for plaster, and every hot week or heavy swim day is made up with more of it. Water short of calcium draws it out of the plaster and grout, leaving a rough, etched surface.
| Area | Supply | Weekly maintenance focus |
|---|---|---|
| Mount Pleasant | Mount Pleasant Waterworks: Middendorf aquifer, reverse osmosis, blended with Charleston Water System | Calcium chloride after large top-ups; alkalinity held up |
| Daniel Island and Cainhoy | Charleston Water System surface water | Calcium raised to the plaster minimum; pH brought down from above 8 |
How soon after a top-up should calcium go in?
Within 24 hours of a significant top-off, before the soft water has time to work on the plaster. On a weekly plan the technician measures calcium by titration and doses to bring it back into the 200 to 400 ppm range.
How is equipment maintained near the marsh?
Equipment near the marsh on Daniel Island falls in the very high corrosion zone, so it gets a freshwater rinse every two weeks and a protective coating applied twice a year; pads within 1,000 feet of tidal marsh are treated as severe. Without marine-grade coatings, Daniel Island equipment can last as little as 3 to 5 years.
- Freshwater rinse
- Every two weeks; weekly within 1,000 feet of tidal marsh
- Coating
- Applied twice a year
- Most at risk
- Heat pump copper, salt cell plates, galvanized motor housings
When does a Mount Pleasant pool need freeze protection?
Mount Pleasant averages 18 to 23 freeze events a winter, and freeze protection is set to start the pump at about 37°F. A partial closing from late November keeps water moving at reduced run times through the cold months.
Which East Cooper neighborhoods are covered?
- Old Village
- I'On
- Snee Farm
- Hobcaw Point
- Park West
- Dunes West
- Carolina Park
- Rivertowne
- Belle Hall
- Daniel Island
- Cainhoy
Who runs the plans?
SC Coastal Pools, based on Johnnie Dodds Blvd and maintaining East Cooper pools since 2017. Island homes are covered under pool maintenance on Isle of Palms and Sullivan's Island, and the peninsula under downtown Charleston. The chemistry targets are on the main page.